Abstract

The construction industry has historically been seen as a sector permeated by numerous deficiencies within its production process. In order to mitigate this problem, we have the philosophy of Lean Construction (LC), where the progress of the construction sector can only be achieved through the continuous identification and elimination of activities that do not add value. The present study analyzes the influence of one of LC concepts, the principle of increasing transparency, on the performance of the constructive step of executing seals on ceramic blocks. A case study was carried out in a residential building, where the degree of knowledge of the employees regarding the activities they perform and the executive methodology used for the execution of masonry in ceramic blocks was analyzed, highlighting the impacts caused by the existence or the lack of techniques for increasing transparency. Through the case study, it was concluded that the low level of transparency of the case-unit promoted a work environment with scarce information flow, causing a production process without standardization, with a high level of uncertainties and with countless wastes.

Metrics

Metrics Loading ...

Author Biographies

Milton Paulino Costa Junior, Universidade Federal do Espírito Santo - UFES

Prof. Dr., Dept. Civil Engineering, UFES, Vitória, ES

Gabriel Depoli Guimarães, Universidade Federal do Espírito Santo - UFES

Graduated in Civil Engineering, Vitória, ES

João Octávio de Vargas Martins, Universidade Federal do Espírito Santo - UFES

Graduated in Civil Engineering, Vitória, ES

Sayonara Maria de Moraes Pinheiro, Universidade Federal do Espírito Santo - UFES

Post-doctorate in civil engineering from ICITECH UPV Instituto de Ciencia y Tecnologia del Hormigón de la Universitat Politécnica de Valencia. Professor at the Universidade Federal do Espírito Santo - UFES

References

BARBOSA, G.; ANDRADE, F.; BIOTTO, C.; MOTA, B. Implementing lean construction effectively in a year in a construction project. In: ANNUAL CONFERENCE OF THE INTERNATIONAL GROUP FOR LEAN CONSTRUCTION, 21., 2013, Fortaleza. Proceedings […]. Fortaleza: [s .n.], 2013. p. 1017-1026.

BARRETO, A. M.; HEINECK, L. F. M. Learning, Structural Masonry Technology and Lean Construction a Case Study In a Small Building Site. In: ANNUAL CONFERENCE OF THE INTERNATIONAL GROUP FOR LEAN CONSTRUCTION, 20., 2012, San Diego. Proceedings [...]. San Diego: [s. n.], 2012. p. 01-10.

CARBONARI, B. M. T. O efeito do projeto sobre a produção. Semina, Londrina, v. 12, n. 4, p. 224-229, dez. 1991.

CARMAGO FILHO, C. A. B. LCAT: ferramenta de avaliação da implementação da construção enxuta. 2017. Dissertação (Mestrado em Engenharia Civil) - Universidade Federal de Goiás, Goiânia, 2017.

FORMOSO, C. T.; SANTOS, A.; POWELL, J. A. An exploratory study on the applicability of process transparency in construction sites. Journal of Construction Research, [s. l.], v. 3, n. 1, p. 35-54, 2002.

FRANCO, L. S. O Projeto das vedações verticais: características e a importância para a racionalização do processo de produção. In: SEMINÁRIO DE TECNOLOGIA E GESTÃO NA PRODUÇÃO DE EDIFÍCIOS, 1998, São Paulo. Proceedings [...]. São Paulo: [s.n.], 1998. v. 1.

GALSWORTH, G. D. Visual workplace visual thinking. 2. ed. New York: CRC Press: Taylor & Francis Group, 2017.

GODOY, A. S. Introdução a pesquisa qualitativa e suas possibilidades. Revista de Administração de Empresas, São Paulo, v. 35, n. 2, p. 57-63, mar./abr. 1995.

GREEN, S. D.; FERNIE, S.; WELLER, S. Making sense of supply chain management: a comparative study of aerospace and construction. Construction Management and Economics, London, v. 23, p. 579-593, 2005.

GREIF, M. The visual factory: building participation through shared information. Portland: Productivity Press, 1991.

HIROTA, E. H.; POWELL, J. A.; DAVEY C. L.; POWELL, J. E.; FORMOSO, C. T. Vencendo barreiras para a aplicação dos princípios da construção enxuta. Semina, Londrina, v. 21, n. 4, p. 17- 25, dez. 2000.

HOWELL, G. A.; BALLARD, G.; TOMMELEIN, I. Construction engineering: reinvigorating the discipline. Journal of Construction Engineering and Management, New York, v. 137, n. 10, p. 740-744, oct. 2011.

IGARASHI, R. The big picture. In: MCTIGHE, E. (ed.). Visual control systems. Cambridge: Productivity Press, 1991. p. 3-12. (The Factory Management Notebook Series, v. 1, n. 2).

KOSKELA, L. Application of the new production philosophy to construction. California: Stanford University, Center of Integrated Facility Enfineering (CIFE), 1992.

KOSKELA, L. J. An exploration towards a production theory and its application to construction. [Finland]: VTT Technical Reserch Centre Of Finland, 2000.

LIKER, J. K. O modelo Toyota: 14 princípios de gestão do maior fabricante do mundo. Tradução de Lene B Ribeiro. Porto Alegre: Bookman, 2005.

MONDEN, Y. Toyota production system: an integrated approach to just-in-time. 4. ed. Boca Raton: CRC Press, 2011.

PAUGET, B.; WALD, A. Relational competence in complex temporary organizations: the case of a French hospital construction project network. International Journal of Project Management, Guildford, v. 31, p. 200-211, feb. 2013.

REGAN, M.; SMITH, J.; LOVE, P. E. Impact of the capital market collapse on public-private partnership infrastructure projects. Journal of Construction Engineering and Management, New York, v. 137, p. 6-16, 2010.

SANTOS, A. Application of flow principles in the production management. 1999. Thesis (Doctorate) - School of Construction and Property Management, University of Salford. Salford, UK, 1999.

SEBRAE. Anuário do trabalho na micro e pequena empresa. 6. ed. Brasília: DIEESE, 2013.

SEGERSTEDT, A.; OLOFSSON, T. Supply chains in the construction industry. Supply Chain Management, Bradford, v. 15, p. 347-353, 2010.

SHINGO, S. O sistema Toyota de produção: do ponto de vista da engenharia de produção. Tradução de Eduardo Schaan. 2. ed. Porto Alegre: Bookman, 1996.

TEZEL, A.; KOSKELA, L.; TZORTZOPOULOS, P.; FORMOSO, C. T.; ALVES, T. Visual management in Brazilian construction companies: taxonomy and guidelines for implementation. Journal of Management in Engineering, New York, v. 31, nov. 2015. DOI: 10.1061/(ASCE)ME.1943-5479.0000354.

TEZEL, B. A.; KOSKELA, L. J.; TZORTZOPOULOS, P. Visual management in construction: Study report on Brazilian cases. Technical Report, University of Salford, Salford, UK, 2010. Available from: http://usir.salford.ac.uk/id/eprint/12865. Access in: Jan. 02, 2021.

TEZEL, A.; KOSKELA, L.; AZIZ, Z. Current condition and future directions for lean construction in highways projects: a small and medium-sized enterprises (SMEs) perspective. International Journal of Project Management, Guildford, v. 36, p. 267-286, 2017.

THOMAZ, E.; FILHO, C. V. M.; CLETO, F. R.; CARDOSO, F. F. Código de práticas nº01: alvenaria de vedação em blocos cerâmicos. São Paulo: Instituto de Pesquisas Tecnológicas do Estado de São Paulo, 2009.

TOMMELEIN, I. Journey toward Lean Construction: Pursuing a Paradigm Shift in the AEC Industry. Journal of Construction Engineering and Management, New York, v. 141, n. 6, jun. 2015.

VERGARA, S. C. Projetos e relatórios de pesquisa em administração. 13. ed. São Paulo: Atlas, 2011.

Downloads

Published

2021-11-03

How to Cite

Costa Junior, M. P., Guimarães, G. D., Martins, J. O. de V., & Pinheiro, S. M. de M. (2021). Analysis of the construction process of masonry in ceramic blocks from the perspective of lean construction. Semina: Ciências Exatas E Tecnológicas, 42(2), 169–180. https://doi.org/10.5433/1679-0375.2021v42n2p169

Issue

Section

Original Article
Loading...